C.R.E. No. 24-
Kowloon Canton Railway.
BRITISH SECTION
ESTIMATE.
93
Main Head
Sub. Head
BRIDGES.
MAJOR BRIDGE No.33
Work: Two 40 ft and two 60 ft Girders at ch.74.500 Drawing C.R.E.206B1.
Quantity DESCRIPTION Rate Unit $ Cts. 45,000 Excavation in foundations. Timbering and pumping. 0 650 55,500 Concrete in foundations. Masonry in superstructure 970 Masonry in coping bedstones &c. 80,000 Pitching slopes. 2/- 0.ft 1 2 40 ft Girder landed in Kowloon. #1 2 40 ft Girders erection & painting. 1750/- each 3,500 00 2 60 ft Girders landed in Kowloon. 4000/- each 8,000 00 2 60 ft Girders erection & painting. 600/- each 1,200 00 10/- 35/- 7,227 22 22,200 00 1,940 00 200 Total 51,517 50 Contingencies 10% 5,151 75 Grand Total 56,669 25OC
00
owlish notns noolwo
.KOITDA2 HZITIЯ8
.3 TAMIT23
IZDOMA
tin l
902
POITIER
AI
DOG, I
C.R.E. No. 24-
kowloon Canton Railway.
BRITISH SECTION
ESTIMATE.
93
*
brati nick.
brofl due
Año 7!
Main Head
Sub. Head
BRIDGES.
MAJOR BRIDGE No.33
Work Two 40 ft and two 60 ft Girders at ch.74.500 Drawing C.R.E,206B1.
AMOUNT.
antity,
DESCRIPTION.
Rate. Unit.
$
Cts.
**hurt al setteswoxt cte, 45,000 Excavation in foundations.
Lenkgeing une gnized i
Item Timbering and pumping.
15 A
'
0,650 Conerete in foundations.
55,500 Masonry in superstructure
ON
970
Masonry in coping bedstones &o.
80,000 Pitahing slopes.
2/- 0.ft
1
2
40 ft Girder landed in Kowloon.
#1
1
ม
2
40 ft Girders erection & painting.
1750/- each
500/
2
60 ft Girders landed in Kowloon.
8000/
2
60 ft Girders erection & painting.
600/
10/f
450 00
4,000
35/
40-%
7,227 22, 200
00
1,940 00
200
8 8 8 8 8 8 8 8 8 8
00
80
3,500
00
1,000 00
10,000
00
1,000
68
Of zoiɔnigninoƆ
Bart
Total
Contingincies 10%
51,517 50
5,151
75
baxo board)
Grand Total
56,669
25